Alcan Cable’s Aluminum Transmission Conductor Powers Largest Wind Farm in Maine

Synopsis:

This brief case study details the challenges and successes behind First Winds’ construction of the Stetson Wind Project, using over 200,000 feet of Alcan Cable’s aluminum transmission conductor.

Download

Click here to download this document.

Sales and Support Locator